Hammer Crusher

      1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, ...

      • Details

        Hammer Crusher

        1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, easy operation and maintenance, etc.


        2. Suitable for crushing various medium-grade and brittle materials.


        3. The compressive strength of the crushed material does not exceed 150 MPa.


        4. It can crush raw materials of different sizes into uniform particles to facilitate the processing of the next process. The mechanical structure is reliable, the production efficiency is high, and the applicability is good.


        Working principle

        The motor drives the rotor to rotate at high speed in the crushing chamber. The material is fed into the machine from the upper feed port and crushed by the impact, impact, shearing and grinding of the high-speed moving hammer. At the bottom of the rotor, there is a screen plate. The particle size smaller than the screen hole size in the crushed material is discharged through the screen plate, and the coarse particle size larger than the screen hole size is retained on the screen plate and continues to be hit and ground by the hammer, and finally discharged from the machine through the screen plate.


        Other instructions

        1. Classification of hammer crushers?


        Hammer crushers can be divided into: single-stage hammer crusher, high-efficiency hammer crusher, sand blasting machine, vertical shaft hammer crusher, reversible hammer crusher, and ring hammer crusher. The ring coal crusher, which replaces the hammer head of the hammer crusher with a steel ring, is a variation of the hammer crusher.


        2. What are the safety precautions for hammer crushers?


        (1) If an emergency fault occurs during operation, the equipment can be stopped first. Do not force the machine to start before the fault is eliminated.


        (2) If an electrical equipment fails, the electrical personnel should be responsible for handling it.


        (3) When it is necessary to enter the machine for inspection, the power switch must be turned off first and a sign indicating that someone is inspecting the machine should be hung. Before inspection, the materials on the inside of the machine should be cleaned to prevent them from falling and injuring people. After the inspection, the upper cover must be closed and the bolts tightened before the test run.


        (4) All safety devices must be intact and secure. The crusher cannot be started when the contact signal and communication equipment fail.

        Related Cases

      ? 2011-2024 Jiangxi Mingxin Metallurgical Equipment Co., Ltd.
      主站蜘蛛池模板: 人人妻人人澡人人爽人人精品浪潮| 好深好爽办公室做视频| 国产成视频在线观看| 亚洲国产一区二区a毛片| 538精品视频在线观看| 永久中文字幕免费视频网站| 天天做天天爱天天综合网| 国产美女一级做a爱视频| 亚洲精品视频在线观看你懂的| 久久香蕉国产视频| 国产视频福利在线| 澳门a毛片免费观看| 国内一级一级毛片a免费| 亚洲欧美激情精品一区二区| 91精东果冻蜜桃星空麻豆| 欧美日韩中文国产一区| 国产精品久久久久网站| 亚洲AV成人无码天堂| 91啦在线视频| 无码成人AAAAA毛片| 四虎免费影院4hu永久免费| 九九久久国产精品免费热6| 顾明月媚肉生香全文| 日本国产中文字幕| 午夜亚洲av日韩av无码大全| julia无码人妻中文字幕在线| 漂亮人妻被黑人久久精品| 国产美女极度色诱视频www| 亚洲av永久无码精品网站| 97人人超人超人国产第一页| 精品日本一区二区三区在线观看| 婷婷六月天激情| 亚洲欧美日韩久久精品第一区| 18未年禁止免费观看| 最新国产乱人伦偷精品免费网站| 国产免费色视频| 一级毛片免费全部播放| 波多野结衣xfplay在线观看| 国产欧美日韩视频在线观看| 亚洲精品午夜久久久伊人| 男女一边摸一边爽爽视频|