Hammer Crusher

      1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, ...

      • Details

        Hammer Crusher

        1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, easy operation and maintenance, etc.


        2. Suitable for crushing various medium-grade and brittle materials.


        3. The compressive strength of the crushed material does not exceed 150 MPa.


        4. It can crush raw materials of different sizes into uniform particles to facilitate the processing of the next process. The mechanical structure is reliable, the production efficiency is high, and the applicability is good.


        Working principle

        The motor drives the rotor to rotate at high speed in the crushing chamber. The material is fed into the machine from the upper feed port and crushed by the impact, impact, shearing and grinding of the high-speed moving hammer. At the bottom of the rotor, there is a screen plate. The particle size smaller than the screen hole size in the crushed material is discharged through the screen plate, and the coarse particle size larger than the screen hole size is retained on the screen plate and continues to be hit and ground by the hammer, and finally discharged from the machine through the screen plate.


        Other instructions

        1. Classification of hammer crushers?


        Hammer crushers can be divided into: single-stage hammer crusher, high-efficiency hammer crusher, sand blasting machine, vertical shaft hammer crusher, reversible hammer crusher, and ring hammer crusher. The ring coal crusher, which replaces the hammer head of the hammer crusher with a steel ring, is a variation of the hammer crusher.


        2. What are the safety precautions for hammer crushers?


        (1) If an emergency fault occurs during operation, the equipment can be stopped first. Do not force the machine to start before the fault is eliminated.


        (2) If an electrical equipment fails, the electrical personnel should be responsible for handling it.


        (3) When it is necessary to enter the machine for inspection, the power switch must be turned off first and a sign indicating that someone is inspecting the machine should be hung. Before inspection, the materials on the inside of the machine should be cleaned to prevent them from falling and injuring people. After the inspection, the upper cover must be closed and the bolts tightened before the test run.


        (4) All safety devices must be intact and secure. The crusher cannot be started when the contact signal and communication equipment fail.

        Related Cases

      ? 2011-2024 Jiangxi Mingxin Metallurgical Equipment Co., Ltd.
      主站蜘蛛池模板: 久久影院最新消息| 国产成人精品亚洲| 亚洲视频你懂的| xxxxx亚洲| gdianav| 紧窄极品名器美妇灌| 日本三级韩国三级三级a级按摩 | 亚洲国产综合在线| 91在线一区二区三区| 正在播放国产夫妻| 国产黄三级三·级三级| 亚洲欧美国产中文| 538精品视频在线观看mp4| 欧美成人在线视频| 国产精品一区二区AV麻豆| 亚洲中文字幕无码久久综合网| 亚洲最大的黄色网| 晚上睡不着来b站一次看过瘾| 国产成人av一区二区三区在线观看| 久久精品国产清自在天天线| 青青青国产视频| 无码av中文一区二区三区桃花岛 | 精品无码一区在线观看| 好男人好资源影视在线4| 人人爽人人澡人人高潮| 99久久综合狠狠综合久久aⅴ| 欧美日韩国产va另类| 国产欧美日韩视频在线观看| 久久国产综合精品swag蓝导航| 色偷偷人人澡人人爽人人模| 少妇人妻偷人精品视蜜桃| 亚洲黄色免费电影| 羞羞视频在线观看入口| 日韩小视频在线观看| 嗯~啊太紧了妖精h| www.日本在线视频| 欧美片免费观看网址| 国产欧美专区在线观看| 久久久久久亚洲精品| 看黄网站在线看| 国产精品视频公开费视频|