Hammer Crusher

      1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, ...

      • Details

        Hammer Crusher

        1. Large crushing ratio (generally 10-25, up to 50), high production capacity, uniform products, less over-crushing, low energy consumption per unit product, simple structure, light equipment weight, easy operation and maintenance, etc.


        2. Suitable for crushing various medium-grade and brittle materials.


        3. The compressive strength of the crushed material does not exceed 150 MPa.


        4. It can crush raw materials of different sizes into uniform particles to facilitate the processing of the next process. The mechanical structure is reliable, the production efficiency is high, and the applicability is good.


        Working principle

        The motor drives the rotor to rotate at high speed in the crushing chamber. The material is fed into the machine from the upper feed port and crushed by the impact, impact, shearing and grinding of the high-speed moving hammer. At the bottom of the rotor, there is a screen plate. The particle size smaller than the screen hole size in the crushed material is discharged through the screen plate, and the coarse particle size larger than the screen hole size is retained on the screen plate and continues to be hit and ground by the hammer, and finally discharged from the machine through the screen plate.


        Other instructions

        1. Classification of hammer crushers?


        Hammer crushers can be divided into: single-stage hammer crusher, high-efficiency hammer crusher, sand blasting machine, vertical shaft hammer crusher, reversible hammer crusher, and ring hammer crusher. The ring coal crusher, which replaces the hammer head of the hammer crusher with a steel ring, is a variation of the hammer crusher.


        2. What are the safety precautions for hammer crushers?


        (1) If an emergency fault occurs during operation, the equipment can be stopped first. Do not force the machine to start before the fault is eliminated.


        (2) If an electrical equipment fails, the electrical personnel should be responsible for handling it.


        (3) When it is necessary to enter the machine for inspection, the power switch must be turned off first and a sign indicating that someone is inspecting the machine should be hung. Before inspection, the materials on the inside of the machine should be cleaned to prevent them from falling and injuring people. After the inspection, the upper cover must be closed and the bolts tightened before the test run.


        (4) All safety devices must be intact and secure. The crusher cannot be started when the contact signal and communication equipment fail.

        Related Cases

      ? 2011-2024 Jiangxi Mingxin Metallurgical Equipment Co., Ltd.
      主站蜘蛛池模板: 亚洲区精品久久一区二区三区| 日韩欧美成人免费中文字幕| 好男人好影视在线观看视频| 午夜私人影院免费体验区| 亚洲免费在线视频观看| 91全国探花精品正在播放| 精品亚洲aⅴ在线观看| 性色AV无码中文AV有码VR| 国产成人精品久久综合| 久久高清内射无套| 高级别墅贵妇交换俱乐部小说| 欧美精品亚洲精品日韩专区va| 国模吧双双大尺度炮交gogo| 亚洲第一视频网站| 4480新热播影院| 欧美jizzhd精品欧美| 在线观看的网站| 再深点灬舒服灬免费观看| 中文字幕欧美日韩| 风间由美性色一区二区三区| 日本福利片国产午夜久久| 国产一区二区免费在线| 丁香六月激情综合| 狠狠精品干练久久久无码中文字幕 | 国产免费a级片| 久久久99视频| 精品国产午夜肉伦伦影院| 娇妻当着我的面被4p经历| 亚洲视频在线一区二区三区| 91亚洲欧美综合高清在线| 极品新婚夜少妇真紧| 国产动作大片中文字幕| 丰满亚洲大尺度无码无码专线| 精品欧美一区二区三区精品久久| 日本道色综合久久影院| 国产18禁黄网站免费观看| √新版天堂资源在线资源| 欧美视频亚洲视频| 国产无遮挡裸体免费视频在线观看 | 被公侵犯肉体中文字幕电影| 成全视频在线观看免费看|